⭐ 1. Set your first paving slab Install your first slab to the exact depth and falls required for your project.
⭐ 2. Position your ProScreed bars ProScreed bars come pre-set for 20 mm paving when the screed bar is flush with the top of the rail. They can also be used with paving slabs up to 40 mm thick.
⭐ 3. Adjust the rail if needed For best results, set the rail around 3–4 mm lower than the thickness of your paving slab.
⭐ 4. Prepare your surface Brush away any loose material from the paving slab that the ProScreed will run along.
⭐ 5. Lay your bedding material Install your laying bed to a rough, even finish.
⭐ 6. Screed your surface Run the ProScreed smoothly across the paving slab to create a full-contact bed, ready for your next slab.
That’s it!
Simply screed and lay — no fuss, no guesswork, and up to 3× faster than traditional methods.
